Zero Waste Scheme

Walmer ward is designated as a pilot/case study to introduce and test ways and means of increasing recycling levels.

A Zero Waste project is proposed where say 25 local household have their waste assessed, given information on ways to reduce waste, then assessed again four weeks later (after two waste collections).

A meeting would then be held with the participants to analyse and discuss the results. The project will be coordinated by Dover District Council.

 

This entry was posted in New Projects. Bookmark the permalink.